Saturday, March 2, 2019
Sand Maker of Hxjq Installs and Runs Smoothly and Easily
Hongxing impact crushers ar the heavy type equipment, and as well as call(a)ed sand make machines. The installation and operation both have strict ruels and instructions. Generally speaking, if you install and use the sand making euqipment according to the chase instructions, the equipment using life, product quality and personal safety stop be guaranteed. OK, lets list the attentions when installing and operating a sand making machine. A. When installation, set the horizontal position. The machine must(prenominal) have the basic conditions 1) feeding materials consecutive . ) large pieces of materials can return back to the machine. 3) there is the lifting equipment upon the machine and it can lift the machine conveniently. 4) there is enough space to check up on one side of crusher. B. Common ruels when operating the sand maker. 1. zeal works in the beginning start-up Sand making machine has a campaign stay for 4 hours in factory and all parts are in order. However, yo u must check up the machine again before start-up. 1) Check up turntable is balanceable or not, that is, wearing parts is installed in a whole set or not . ) The position of trigon belt is suitable or not, that is, strain is suitable or not. 3) all told parts are connected steadily or not, and screws are secure or not 1-4 Check up if there is a quill or sundries in the machine. Close the inspection door and plug into safety bolt. Dont open inspection door when operation. 1-5 Check up the running bursting charge of engine and turntable is correct or not anticlockwise revolution from the feeding port 1-6 Check up lubrication is enough or not. 2. Start-up without appoint ) Ammeter is working or not . 2) The control system Y/ reduction the pressure start-up Y/ time transfer relay should be modify as 50S or so. 3) Start-up of double electrical machine Stand-alone start-up and twain engine start-up. You can choose the start-up according to the power of electric ne dickensrk. 3. S tart-up with load. 1) fare the materials after the machine have a successful trial run without load and the running of engine becomes type. 2) Max Feed Grain sizing must be executed strictly according to instruction. ) Youd better enjoin in the materials less than 5 mm at the beginning of start-up ( at least in half a minute) so that it can create protection layer in the machine. 4) When you feed the materials at the beginning, there willing be a 30-60 seconds imbalance the machine. However, you mustnt stop the machine at formerly and that feed more materials until the vibration disappears. If there is violent shock and perverted noise, you should stop the machine to check up carefully. 5) Youd better add magnetised cartridge remover beside feeding advice for fear that iron damages the machine domiciliate in the machine. ) Max electric on-going value is not come about rated current one of running motor when feeding the materials. If the humidity of desolate materials is too high, it maybe block the feed opening of cardinal eat and overflow port of scattered flow and influence electric current value. The electric current value is too high and cant be tear down because the overflow port of scattered flow is blocked. Contrarily, the feed opening of central flow is blocked. You must stop the machine to clean up all feed openings and then work sequentially. ) Dual drive motor must regulate and bring the strain of two groups of triangle belts into harmony. Look into two groups of electric current value of motor is accord or not. 4. immobilise the machine 1) You must stop feeding the materials before stopping the machine. 2) The ammeter should be without load before stopping the machine. impact crusher http//www. hxjqchina. com/product-list_12. html sand making machine http//www. hxjqchina. com/product-list_57. html sand maker http//www. hxjqchina. com/product-list_57. html magnetic separator http//www. hxjq-crusher. com/60. html
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment